Bottom Filled Mold

By Matthew John M. Krane

Mechanical Engineering, Purdue University, West Lafayette, IN

Published on

Abstract

Calculation of mold filling times, with and without a constant height of metal in a riser. Problem uses modified Bernoulli equation for the mechanical energy balance and the students are asked to determine which resistances are significant.

Assignment solution time: 2 hours

Credits

Copyright 2007 Matthew John M. Krane,
Licensed under MIT Open CourseWare

Cite this work

Researchers should cite this work as follows:

  • Matthew John M. Krane (2019), "Bottom Filled Mold," https://nanohub.org/resources/30229.

    BibTex | EndNote

Time

Submitter

Adam Powell

Mechanical Engineering, Worcester Polytechnic Institute, Worcester, MA

Tags